Removal & encapsulation at Catterick Garrison

Catterick Garrison, located in North Yorkshire, is the largest British Army garrison in the world and has a long history of military development and expansion.
Like many locations across the UK, the area includes buildings constructed during the post-war period using prefabricated construction methods. Buildings of this age and type frequently incorporated asbestos-containing materials (ACMs) as part of their original construction, including asbestos insulating board (AIB), textured coatings and other asbestos-containing components.
Due to the nature of the construction, some ACMs can form an integral part of the building fabric. Following our site visit with representatives of K7 Prime Estates Ltd, Henderson Environmental Services Ltd therefore recommended a proportionate, risk-based approach. Rather than unnecessarily disturbing asbestos materials that could safely remain in situ, removal or encapsulation would be undertaken in areas where planned refurbishment works were likely to disturb the identified ACMs.
This approach allowed the refurbishment works to progress safely while avoiding unnecessary disturbance of asbestos-containing materials elsewhere within the property.
The problem
K7 Prime Estates Ltd required asbestos remedial works at a property in Catterick Garrison as part of planned refurbishment works. Following a site visit with the client’s representatives, Henderson Environmental reviewed the asbestos-containing materials present and the areas likely to be affected by the proposed refurbishment.
The asbestos included textured coating ceilings, a minimal amount of loose asbestos insulating board (AIB) debris and an AIB panel. As some asbestos-containing materials formed part of the building’s fabrication, wholesale removal was not considered necessary. The key risk was disturbance of these materials during refurbishment, which could result in the release of asbestos fibres if not appropriately managed.
The process and solution
Following the site visit, Henderson Environmental submitted a proposal setting out a proportionate, risk-based approach to the works. The proposal was accepted by K7 Prime Estates Ltd.
It was recommended that asbestos removal or encapsulation should be undertaken only in areas where the planned refurbishment work was likely to disturb the asbestos-containing materials. This proportionate approach avoided unnecessary disturbance while ensuring that affected areas could be refurbished safely. It also helped to minimise unnecessary costs for the client without compromising health and safety or the effective management of asbestos risk.

The agreed works comprised the controlled removal of textured coating ceilings, removal of the small quantity of loose AIB debris, and encapsulation of the AIB panel to prevent future disturbance and fibre release. The works were planned and carried out using appropriate asbestos controls and in coordination with the client’s refurbishment requirements.
Upon completion, air monitoring would be undertaken by an independent UKAS-accredited analytical company, providing independent verification of the area following completion of the asbestos works.
Client testimonial
“I would like to thank Ian for the work he has completed at my house in Yorkshire. I was in a pickle with another company who had done a survey and was saying the job was much bigger than it actually was. The work was completed really quickly and Ian has a wealth of knowledge and recommendations. I would definitely use them again in future for other properties if the need arose. I would definitely recommend them to others, they are very helpful.”